It doesn't usually look that bad
But I'm shifting everything out of the machine shop space
Some will go to the timber store
Some will be kept
I have found enough left overs to insulate and line the 30m2 area
Found all the power points and light switches I need
Have enough circuits left on the mains to do it all
Just need to relocate two 3 phase circuits there
Anything you can see that you want just ask
Bookmarks