Thanks for that
The drainage is going to be a close one. The site slopes about 800mm side to side and is about 300mm from end to end, the soil is quite permaable, and theres a main drainage canal running on the down side (drain goes for miles up and down from this site. At the moment the thoughts are along yours, with the addtion of novaflow pipes in as many as possible - all draining towards the canal drain.
The power distro around the site, we might be onto a moleplow to put in the main feed. Hopefully at the same time we can get so ducts run around the place for your exact reasons. The whole site will have wifi and internet(target cameras, target control, site cameras, access control, scoring, porn watching while waiting to shoot, reading the forum, etc) but getting power around is still being sorted (lighting, running boar, target turning actuators, access control, )
I'll try and post some pics up etc, as and when things of note happen.
Bookmarks